Basin Production & Drilling Analytics
Comprehensive multi-reservoir benchmarking across 6,098 Permian Basin horizontal wells.
Google Vertex AI Production Engine & SHAP Explainer
Automated Machine Learning (AutoML) regression engine evaluating 17 geological and engineering parameters.
SHapley Additive exPlanations quantify the exact bbl/ft contribution added or subtracted by each parameter.
Multi-Objective Portfolio Capital Optimizer
Finding the Pareto Frontier: Maximizing 12-Month Cumulative Oil while Minimizing Total Well Expenditure.
3 Optimal Solutions under $5.0 MM USD Budget Limit
"Shorter but harder" design. Heavy sand loading creates maximum conductivity, generating the highest total oil volume.
Most Capital-Efficient. Saves $1.32M (-28% cost) for only 5% less oil, maximizing Rate of Return!
Standard low-risk development design suitable for shallower, low-cost benches with moderate energy.
Subsurface Zone Diagnostic: Best vs Worst Well Comparison
Select any target reservoir formation in the Permian Basin to perform a side-by-side post-mortem on top vs bottom producers.
| Parameter | Best Well | Worst Well | Variance (Δ) | Engineering Impact |
|---|
Permian Basin Well Master Registry
6,098 recorded horizontal wells across Wolfcamp and Spraberry benches.
| Well ID | Operator | Reservoir | Year | Lateral (ft) | Proppant (lbs/ft) | Pressure | Oil / Foot | 12M Cum (BBL) | Total Cost |
|---|